[cgl_discussion] [validation_framework] ABAT System and Test Suite milestones post
ed
Fleischer, Julie N
julie.n.fleischer at intel.com
Wed Aug 21 12:18:20 PDT 2002
The milestones for the Automated Basic Acceptance Tool (a tool to verify the
health of all CGLE builds) are posted on the CGL Validation website -
http://developer.osdl.org/validation/milestones.php.
A brief overview is:
By M2:
- The ABAT Tool is posting results to Tinderbox.
- ABAT suites which currently exist are integrated into the ABAT System.
By M3:
- ABAT suites corresponding to each of the validation suites are created.
Thanks.
---------------
Julie Fleischer
Intel Corporation
503-677-5700
julie.n.fleischer at intel.com
More information about the cgl_discussion
mailing list